Home / About Kolomore
About Kolomore
Industrial finisher in Middelfart, wood specialist.
Kolomore paints for businesses, mostly wood for the wood industry and the construction sector. We can do most things when it comes to industrial coating, painting and surface treatment.
30 years of experience in industrial coating shows. Bo Hjorth Jensen has been in the industry since 1995. We know what spray painting is all about, and we make it work in practice, even when the job is demanding. We mostly paint wood, and we make it look good and last.
The history
Kolomore, layer by layer.
From a 260 m² spare-time business in 2017 to a 3,000 m² factory in Middelfart with production in two halls. Each year has added a layer. Choose a year and read what happened.
01 / 10 · 260 m²
2017
Kolomore is founded as a 260 m² spare-time business.
Kolomore is founded as a spare-time business in 260 m²: small rented premises at Alsvej 2 in Middelfart with private houses in the back garden and no outdoor area.
The machinery consists of a paint shop bought second-hand from an open prison that was closing its paint workshop. It comprises a spray booth, 2 airless pumps, some trolleys, a compressor and a drying trolley.
The company is launched with a web shop where private customers can order painting of kitchen fronts, doors, chairs, tables, Montana shelving and the like.
Three months after the launch, demand is so great that the founder, Bo Hjorth Jensen, has to decide whether to go all-in on Kolomore or close it down again, because the workload is too big to keep it as a spare-time business.

The first hall, 260 m² 
The first hall, April 2017 
The first paint booth, December 2017 02 / 10 · First automatic spray machine
2018
We install our first automatic spray machine as a stand-alone machine.
Without having gone looking for it, we win our first industrial customer. It is a customer who needs panels painted for shop fittings, and our first automatic spray machine, a Ceetec DuoFlex, is installed as a stand-alone machine in the small workshop.
In 2018 Kolomore hires its first employee.
The same year we join Interforce. In doing so, we commit to giving our employees time off for training and education if they are volunteers or reservists in the Danish armed forces.
In the first years we deliver the goods to private customers ourselves in our van.

The first automatic spray machine, a Duo FlexSpray 
The first automatic spray machine, June 2018 
The van for private customers, April 2018 03 / 10 · 1,100 m²
2019
Kolomore moves into 1,100 m² premises and begins building its first automatic painting line.
Kolomore moves to new rented premises of 1,100 square metres at Værkstedvej 16B in Middelfart. On moving in, a 21-metre venturi nozzle oven and a 3-metre air-cooled cooling zone are installed at the same time, so panels can be painted and dried in one pass.
At this point, private and industrial customers account for roughly 50/50 of turnover.
The new premises also come with good outdoor areas, but unfortunately there is no room on the site to load lorries with goods, so it is done on the public road.

The 1,100 m² hall 
The facade on Værkstedvej, April 2019 
A look into the venturi nozzle oven with clear-lacquered tabletops, March 2019 04 / 10 · Burnblock
2020
The world is hit by coronavirus lockdowns, which means that our industrial customers more or less shut down. Together with Burnblock, we start developing the world’s first class B-approved treatment for standard fire-retardant impregnated wood.
The world is hit by coronavirus lockdowns, which means that our industrial customers, who mainly make shop fittings for retail stores, more or less shut down, because no shops are being opened while the world is largely closed to ordinary retail for much of the year.
Fortunately, the market for painting doors, kitchens and the like for private customers booms after people have been asked to work from home. So we have plenty to do, just not on our automatic painting lines for flat workpieces.
We are contacted by Burnblock, who are looking for a partner to help develop surface treatments for fire-impregnated wood that do not destroy the classification the wood has achieved with the fire impregnation. We take on the project. Our automatic lines are standing idle anyway.

Boards on their way to a fire test 05 / 10 · CE and water-based
2021
We begin systematically phasing out solvent-based products where a suitable water-based alternative exists. At the same time, we become the first in the world to obtain CE marking to EN 14915 of our process for painting Burnblock-impregnated wood.
After much trial and error, together with Burnblock we finally succeed in finding a method and some products that can go through an SBI fire test and pass.
Based on this system, we introduce an FPM (factory production manual) that can form the basis of a CE certification under EN 14915, containing the first painting processes fully approved for application on top of Burnblock.
Because the world is in lockdown, the CE audit takes place over a video link, an unusual experience that took some getting used to and trust from both sides.
In 2021 we make a strategic decision to only take new products into the range if they are water-based, and to only take on new customers if they have the ambition and potential to switch to water-based products within a short time.

The CE marking on a fire-protected profile 
Video from the trials with Burnblock 
The trials with Burnblock 06 / 10 · The UV line
2022
We build our dedicated UV line for UV lacquering of panels and priming of MDF panels. At the same time, we start building our new 1,800 m² factory in Middelfart’s industrial area along the E20. By the end of the year, regular production has been converted to water-based systems.
In 2022 the world is still in lockdown for much of the year. That does not, however, stop the great success we have with offering painted wood components with CE-marked fire properties. We outgrow our premises on Værkstedvej and start building our new factory of 1,800 m².
In 2022 we decide to focus the business on industrial applications, and so we stop offering private customers to have their kitchens, doors and so on painted.
While we build the new factory, we install a UV roller line, initially intended for lacquering fire-impregnated products that need a fire classification, which we succeed with fairly quickly.
It is in 2022 that we take the full step and declare publicly that VOC-based products are now finished in our production. The policy of only taking on new customers who use solvent-based products if there is a prospect of a switch to water still stands.
At this point there are 3 employees, and the first staff policy takes shape. The policy mainly covers equality for all and general matters concerning working hours.
In 2022 we also redesign our logo and wordmark. We drop the coloured stripes and the suffix “industrilakering” (industrial coating) to give our marketing a simpler look.
07 / 10 · New factory
2023
We move into the newly built factory, and at the same time we expand the drying capacity on the traverse line, so that it can produce twice as fast.
In January 2023 we move into the new factory on Skærgårdsvænget.
When the traverse line is moved, the line is extended: a multi-level oven with 5 levels is added, and the cooling zone is extended to 6 metres and fitted with water cooling, cooled in pipes buried in the ground. A concept we invented ourselves to lower energy consumption and to have uniform, effective cooling all year round.
In addition to extending the drying and cooling capacity, we also built an automatic spray machine for profiles with its own profile sander, profile feeder and a flash-off into our traverse line, so we could use the oven either to dry panels painted in the traverse line or profiles painted in the profile line.
The new factory has district heating, and we convert the ovens so they run on district heating instead of natural-gas-heated hot water. The factory itself and the offices are of course also heated by district heating.
Security at the factory is also stepped up: the whole site is fenced, and there is video surveillance both outside and inside around the clock.
Our staff policy is extended so we take greater responsibility. For example, we introduce a ban on smoking and nicotine during working hours.


The new factory from the air and the facade 
The TopFlow automatic spray machine for mouldings arrives 
The ground cooling 08 / 10 · Hall 2
2024
We add a 1,200 m² warehouse (hall 2) to the factory, bringing the total area to 3,000 m².
We extend our UV roller line with an extra roller and oven, so we can now apply 3 coats of lacquer in one pass.
In 2024 we install solar panels on the roof of hall 1 to be largely self-sufficient in electricity.
We start running out of space and build a new 1,200 m² warehouse for the factory.
In 2024 we are presented with the Interforce shield.



Building hall 2, and the 3D drawing 
The solar panels on the roof of hall 1 
The building site at the factory, July 2024 
The UV roller line, September 2024 
The Interforce shield is presented, November 2024 09 / 10 · Vacumat
2025
We start production with the Vacumat.
In January we move into our new warehouse, which opens up completely new possibilities for large quantities of goods in our production.
We set up a Vacumat in our production, which opens up new possibilities, especially for colouring profiles and for painting profiles partially, so certain areas of a profile can be left completely unpainted with a sharp transition from painted to unpainted.
In 2025 we publish our first ESG report.

The Vacumat 
Production, June 2025 
The factory in Middelfart from the air, May 2025 10 / 10 · Profile line
2026
We set up a profile painting line in the most recently built hall (hall 2), so that the production of profiles and panels is now split between two production halls.
To meet greater demand, we decide to rebuild our production and divide it into two halls. Hall 1 is for treating panels on the traverse line and the UV roller line.
In hall 2 (the new warehouse) we set up production for profiles. We place the Vacumat in hall 2 and build a new line solely for painting profiles.
The “new” line consists of the machines we built onto the drying oven of the traverse line in 2023 (automatic spray machine for profiles, feeder, sanding machine, flash-off and so on), plus a transverse venturi nozzle oven and some more conveyors, which together form a complete line just for painting boards, mouldings and the like.
We are extending the traverse line with built-in UV drying, so that we can produce with water-based UV lacquers.

The profile line 
Hall 2, March 2026 
Hall 2 during the rebuild, March 2026
OTISIF · On Time, In Spec, In Full
OTISIF
- On time.On time. We deliver at the agreed time, neither earlier nor later.
- In spec.To the agreed quality. We deliver the quality we have agreed, even when it is difficult.
- In full.In the agreed quantity. We have the capacity to deliver the agreed quantity, even when it is a lot.
Machines and materials
Leading suppliers, at home and abroad.
We have four production lines: the traverse line, the profile line, the UV roller line and the Vacumat. The traverse line and the UV roller line paint panels, and the profile line and the Vacumat paint boards and profiles. The factory in Middelfart covers 3,000 m², and production is split between two halls. See what runs where.
We work with leading suppliers from Denmark and abroad on machines, raw materials and auxiliary materials. The traverse line has an automatic spray machine from Ceetec, we paint with systems from Sherwin-Williams, Tikkurila, Remmers, Teknos, Masquelack, TREET and SIOO:X, among others, and the fire-retardant impregnation is carried out in collaboration with Burnblock. Read about our water-based paint suppliers.




The people behind
The people you talk to.
Do you have a production run that needs painting?
Tell us the workpiece, quantity and finish you want, and we will get back to you with a quote. If you have drawings or a sample, mention it in your message.

Bo Hjorth Jensen founder and CEOCall +45 93 96 18 28Email bhj@kolomore.com
Business customers only. No sales to private customers




















Bo Hjorth Jensen
Henrik Lillelund